Amelia, VA interconnection queue

6 active projects totalling 160.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

6active projects
160.4active MW
8total filed
Queue IDProjectkVMWResourceStatus
C01-2000 Jetersville-Ponton 115 kV 115 100 Battery Active
AG1-048 Jetersville-Ponton 115 kV 115 52.5 Solar Withdrawn
AF1-294 Amelia Energy Facility 115 22.2 Solar EP
AF2-115 Amelia Energy Facility 115 13.5 Solar EP
AH1-280 Jetersville-Ponton 115 kV 115 12 Solar Active
C01-1347 Jetersville-Ponton 115 kV 115 12 Solar Withdrawn
AG1-021 Amelia Energy Facility 115 10.8 Solar EP
AC1-062 Amelia 1 34.5 1.9 Hybrid In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.