Elwood 345 kV

PJM queue ID C01-1311

Elwood 345 kV (C01-1311) is listed in the PJM interconnection queue as a 300 MW battery project in Will County, IL. The filing names Elwood as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2029.

Queue IDC01-1311
Project nameElwood 345 kV
Status (as published)Active
SubstationElwood
Point of interconnectionElwood 345 kV
CountyWill
StateIL
Voltage345 kV
Capacity300 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-12-31
Source datasetcycle

Same substation and county

Elwood substation: 4 requests in the PJM queue, 3 active totaling 1,535.9 MW.

Queue IDProjectMWResourceStatus
AC1-204Jackson Generation1,115.9GasIn Service
AD2-194Jackson Generation120GasPartially in Service - Under Construction
AE1-070Elwood 345 kV135GasWithdrawn

Will, IL: 66 requests in the PJM queue, 22 active totaling 3,615.4 MW.

A substation with the same name is named in PJM transmission planning materials: Elwood (COMED, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperElwood Energy LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy300.0
MW capacity300.0
MFO300.0
Submitted date4/25/2026
Last updated6/26/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.