Jackson Generation

PJM queue ID AC1-204

Jackson Generation (AC1-204) is listed in the PJM interconnection queue as a 1,115.9 MW gas project in Will County, IL. The filing names Elwood as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 1, 2022.

Queue IDAC1-204
Project nameJackson Generation
Status (as published)In Service
SubstationElwood
Point of interconnectionElwood
CountyWill
StateIL
VoltageNot reported
Capacity1,115.9 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2022-04-01
Source datasetserial

Same substation and county

Elwood substation: 4 requests in the PJM queue, 3 active totaling 1,535.9 MW.

Queue IDProjectMWResourceStatus
C01-1311Elwood 345 kV300BatteryActive
AD2-194Jackson Generation120GasPartially in Service - Under Construction
AE1-070Elwood 345 kV135GasWithdrawn

Will, IL: 66 requests in the PJM queue, 22 active totaling 3,615.4 MW.

A substation with the same name is named in PJM transmission planning materials: Elwood (COMED, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1200.9
MW capacity1115.9
MFO1200.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first