Dequine-Eugene 345 kV (AG2-163) is listed in the PJM interconnection queue as a 35 MW solar project in Fountain County, IN. The filing names Dequine-Eugene as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.

Queue IDAG2-163
Project nameDequine-Eugene 345 kV
Status (as published)Active
SubstationDequine-Eugene
Point of interconnectionDequine-Eugene 345 kV
CountyFountain
StateIN
Voltage345 kV
Capacity35 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetcycle

Same substation and county

Dequine-Eugene substation: 4 requests in the PJM queue, 3 active totaling 203 MW.

Queue IDProjectMWResourceStatus
AG1-226Dolphin Solar142SolarEP
AG1-237Warren County Wind Energy Center26WindEngineering and Procurement
U1-024Dequine-Eugene 345kV65WindWithdrawn

Fountain, IN: 10 requests in the PJM queue, 4 active totaling 294 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperDolphin Solar LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy250.0
MW capacity35.0
MFO700.0
Submitted date2/25/2021
Last updated9/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first