Warren County Wind Energy Center (AG1-237) is listed in the PJM interconnection queue as a 26 MW wind project in IN. The filing names Dequine-Eugene as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2029.

Queue IDAG1-237
Project nameWarren County Wind Energy Center
Status (as published)Engineering and Procurement
SubstationDequine-Eugene
Point of interconnectionDequine-Eugene 345 kV
CountyNot reported
StateIN
Voltage345 kV
Capacity26 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2029-12-31
Source datasetserial

Same substation and county

Dequine-Eugene substation: 4 requests in the PJM queue, 3 active totaling 203 MW.

Queue IDProjectMWResourceStatus
AG1-226Dolphin Solar142SolarEP
AG2-163Dequine-Eugene 345 kV35SolarActive
U1-024Dequine-Eugene 345kV65WindWithdrawn

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity26
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.