Substation Scout

Mammoth North Solar Project

PJM queue ID AF2-134

Mammoth North Solar Project (AF2-134) is listed in the PJM interconnection queue as a 60 MW solar project in Starke County, IN. The filing names Olive-Reynolds #2 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2024.

Queue IDAF2-134
Project nameMammoth North Solar Project
Status (as published)In Service
SubstationOlive-Reynolds #2
Point of interconnectionOlive-Reynolds #2 345 kV
CountyStarke
StateIN
Voltage345 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-06-30
Source datasetserial

Same substation and county

Olive-Reynolds #2 substation: 7 requests in the PJM queue, 3 active totaling 336 MW.

Queue IDProjectMWResourceStatus
AG1-349Mayapple Solar156SolarEngineering and Procurement
AF2-205Moss Creek Solar120SolarEngineering and Procurement
AF2-190Olive-Reynolds #2 345 kV156SolarWithdrawn
AH1-709Olive-Reynolds #2 345 kV80BatteryWithdrawn
AG2-117Olive-Reynolds #2 345 kV60HybridWithdrawn
AI2-357Olive-Reynolds #2 345 kV18.2SolarWithdrawn

Starke, IN: 6 requests in the PJM queue, 3 active totaling 366 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO400

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first