Mammoth North Solar Project
PJM queue ID AF2-134
Mammoth North Solar Project (AF2-134) is listed in the PJM interconnection queue as a 60 MW solar project in Starke County, IN. The filing names Olive-Reynolds #2 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2024.
| Queue ID | AF2-134 |
|---|---|
| Project name | Mammoth North Solar Project |
| Status (as published) | In Service |
| Substation | Olive-Reynolds #2 |
| Point of interconnection | Olive-Reynolds #2 345 kV |
| County | Starke |
| State | IN |
| Voltage | 345 kV |
| Capacity | 60 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-06-30 |
| Source dataset | serial |
Same substation and county
Olive-Reynolds #2 substation: 7 requests in the PJM queue, 3 active totaling 336 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-349 | Mayapple Solar | 156 | Solar | Engineering and Procurement |
| AF2-205 | Moss Creek Solar | 120 | Solar | Engineering and Procurement |
| AF2-190 | Olive-Reynolds #2 345 kV | 156 | Solar | Withdrawn |
| AH1-709 | Olive-Reynolds #2 345 kV | 80 | Battery | Withdrawn |
| AG2-117 | Olive-Reynolds #2 345 kV | 60 | Hybrid | Withdrawn |
| AI2-357 | Olive-Reynolds #2 345 kV | 18.2 | Solar | Withdrawn |
Starke, IN: 6 requests in the PJM queue, 3 active totaling 366 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 60 |
| MFO | 400 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.