Moss Creek Solar
PJM queue ID AF2-205
Moss Creek Solar (AF2-205) is listed in the PJM interconnection queue as a 120 MW solar project in Pulaski County, IN. The filing names Olive-Reynolds #2 as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 22, 2028.
| Queue ID | AF2-205 |
|---|---|
| Project name | Moss Creek Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Olive-Reynolds #2 |
| Point of interconnection | Olive-Reynolds #2 345 kV |
| County | Pulaski |
| State | IN |
| Voltage | 345 kV |
| Capacity | 120 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-03-22 |
| Source dataset | serial |
Same substation and county
Olive-Reynolds #2 substation: 7 requests in the PJM queue, 3 active totaling 336 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-349 | Mayapple Solar | 156 | Solar | Engineering and Procurement |
| AF2-134 | Mammoth North Solar Project | 60 | Solar | In Service |
| AF2-190 | Olive-Reynolds #2 345 kV | 156 | Solar | Withdrawn |
| AH1-709 | Olive-Reynolds #2 345 kV | 80 | Battery | Withdrawn |
| AG2-117 | Olive-Reynolds #2 345 kV | 60 | Hybrid | Withdrawn |
| AI2-357 | Olive-Reynolds #2 345 kV | 18.2 | Solar | Withdrawn |
Pulaski, IN: 21 requests in the PJM queue, 11 active totaling 1,270.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 120 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.