Rock River ESS (AG1-044) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Whiteside County, IL. The filing names Whiteside County as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 30, 2021.

Queue IDAG1-044
Project nameRock River ESS
Status (as published)In Service
SubstationWhiteside County
Point of interconnectionWhiteside County
CountyWhiteside
StateIL
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2021-07-30
Source datasetserial

Same substation and county

Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0.5
MW capacity0
MFO0.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.