Substation Scout

Washington Energy Facility

PJM queue ID AH1-719

Washington Energy Facility (AH1-719) is listed in the PJM interconnection queue as a 21 MW gas project in Washington County, OH. The filing names Beverly as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of June 1, 2027.

Queue IDAH1-719
Project nameWashington Energy Facility
Status (as published)EP
SubstationBeverly
Point of interconnectionBeverly 345 kV
CountyWashington
StateOH
Voltage345 kV
Capacity21 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2027-06-01
Source datasetcycle

Same substation and county

Beverly substation: 2 requests in the PJM queue, 2 active totaling 41 MW.

Queue IDProjectMWResourceStatus
S35Washington Energy Facility20CoalIn Service

Washington, OH: 14 requests in the PJM queue, 7 active totaling 180.5 MW.

A substation with the same name is named in PJM transmission planning materials: Beverly (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a Active → EP

Full change log →

Additional filed fields

DeveloperWashington Power Generation LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC2
StageFinal Agreement
MW energy24.0
MW capacity21.0
MFO694.0
Submitted date4/3/2025
Last updated7/10/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first