Muskingum River #5

PJM queue ID T164

Muskingum River #5 (T164) is listed in the PJM interconnection queue as a 15 MW coal project in Washington County, OH. The filing names Muskingum River as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 1, 2008.

Queue IDT164
Project nameMuskingum River #5
Status (as published)In Service
SubstationMuskingum River
Point of interconnectionMuskingum River
CountyWashington
StateOH
VoltageNot reported
Capacity15 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Target commercial operation2008-02-01
Source datasetserial

Same substation and county

Washington, OH: 14 requests in the PJM queue, 7 active totaling 180.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15
MW capacity15
MFO600

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.