Rolling Hills Generating

PJM queue ID AF2-395

Rolling Hills Generating (AF2-395) is listed in the PJM interconnection queue as a 89.6 MW gas project in Vinton County, OH. The filing names Flatlick as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 1, 2023.

Queue IDAF2-395
Project nameRolling Hills Generating
Status (as published)In Service
SubstationFlatlick
Point of interconnectionFlatlick 765 kV
CountyVinton
StateOH
Voltage765 kV
Capacity89.6 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2023-04-01
Source datasetserial

Same substation and county

Flatlick substation: 3 requests in the PJM queue, 1 active totaling 89.6 MW.

Queue IDProjectMWResourceStatus
C01-2045Flatlick 765 kV624.5GasWithdrawn
X3-051Flatlick 765kV610GasWithdrawn

Vinton, OH: 8 requests in the PJM queue, 6 active totaling 334.6 MW.

A substation with the same name is named in PJM transmission planning materials: Flatlick (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy51.1
MW capacity89.6
MFO1045

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first