Substation Scout

Bitter Ridge Wind Farm

PJM queue ID AG1-017

Bitter Ridge Wind Farm (AG1-017) is listed in the PJM interconnection queue as a 2.3 MW wind project in Jay County, IN. The filing names Jay as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2026.

Queue IDAG1-017
Project nameBitter Ridge Wind Farm
Status (as published)In Service
SubstationJay
Point of interconnectionJay 138 kV
CountyJay
StateIN
Voltage138 kV
Capacity2.3 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2026-07-31
Source datasetserial

Same substation and county

Jay substation: 12 requests in the PJM queue, 5 active totaling 200 MW.

Queue IDProjectMWResourceStatus
AF2-068Rosegold Solar90SolarEP
AG1-047Sun Chief Solar Farm60SolarEngineering and Procurement
C01-1593Jay 138 kV30.8WindActive
AC2-176Bitter Ridge Wind Farm16.9WindIn Service
AG1-006Jay 138 kV60SolarWithdrawn
AH2-371Jay 138 kV50BatteryWithdrawn
AI2-399Jay 138 kV36SolarWithdrawn
AG2-577Jay 138 kV30SolarWithdrawn
AG2-578Jay 69 kV30SolarWithdrawn
AI2-422Jay 138 kV12SolarWithdrawn
AI2-423Jay 69 kV12SolarWithdrawn

Jay, IN: 30 requests in the PJM queue, 10 active totaling 477.4 MW.

A substation with the same name is named in PJM transmission planning materials: Jay (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy12.64
MW capacity2.26
MFO142.64

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first