Jay 138 kV
PJM queue ID C01-1593
Jay 138 kV (C01-1593) is listed in the PJM interconnection queue as a 30.8 MW wind project in Jay County, IN. The filing names Jay as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2029.
| Queue ID | C01-1593 |
|---|---|
| Project name | Jay 138 kV |
| Status (as published) | Active |
| Substation | Jay |
| Point of interconnection | Jay 138 kV |
| County | Jay |
| State | IN |
| Voltage | 138 kV |
| Capacity | 30.8 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Jay substation: 12 requests in the PJM queue, 5 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-068 | Rosegold Solar | 90 | Solar | EP |
| AG1-047 | Sun Chief Solar Farm | 60 | Solar | Engineering and Procurement |
| AC2-176 | Bitter Ridge Wind Farm | 16.9 | Wind | In Service |
| AG1-017 | Bitter Ridge Wind Farm | 2.3 | Wind | In Service |
| AG1-006 | Jay 138 kV | 60 | Solar | Withdrawn |
| AH2-371 | Jay 138 kV | 50 | Battery | Withdrawn |
| AI2-399 | Jay 138 kV | 36 | Solar | Withdrawn |
| AG2-577 | Jay 138 kV | 30 | Solar | Withdrawn |
| AG2-578 | Jay 69 kV | 30 | Solar | Withdrawn |
| AI2-422 | Jay 138 kV | 12 | Solar | Withdrawn |
| AI2-423 | Jay 69 kV | 12 | Solar | Withdrawn |
Jay, IN: 30 requests in the PJM queue, 10 active totaling 477.4 MW.
A substation with the same name is named in PJM transmission planning materials: Jay (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Bitter Ridge Wind Farm, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 30.8 |
| MFO | 142.64 |
| Submitted date | 4/27/2026 |
| Last updated | 6/16/2026 |