Knoxville Solar (AD2-085) is listed in the PJM interconnection queue as a 19.4 MW solar project in Isle of Wight County, VA. The filing names Myrtle-Windsor DP as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 1, 2027.

Queue IDAD2-085
Project nameKnoxville Solar
Status (as published)Engineering and Procurement
SubstationMyrtle-Windsor DP
Point of interconnectionMyrtle-Windsor DP 115kV
CountyIsle of Wight
StateVA
Voltage115 kV
Capacity19.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-01
Source datasetserial

Same substation and county

Isle of Wight, VA: 25 requests in the PJM queue, 9 active totaling 444.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy51
MW capacity19.38
MFO51

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first