Edgecombe, NC interconnection queue

8 active projects totalling 341.9 MW in the PJM queue, plus 15 with terminal status (shown greyed).

8active projects
341.9active MW
23total filed
Queue IDProjectkVMWResourceStatus
AG1-439 Chinquapin 230 kV 230 150 Solar Withdrawn
AE1-236 Corson-Septa 500 kV 500 122 Solar Withdrawn
AF2-303 Swift Creek Solar 230 100 Hybrid Engineering and Procurement
AG1-444 Chinquapin 230 kV 230 80 Battery Withdrawn
AB2-059 Moccasin Creek Solar 115 66 Solar In Service
AF2-214 Heartsease DP-Anaconda 115 kV 115 60.5 Battery Withdrawn
AB1-081 Harts Mill Solar 115 56 Solar In Service
AH1-312 Shilo DP – Conetoe DP 115 kV 115 48 Solar Withdrawn
AD2-089 Anaconda-Tar River 115 kV 115 45 Solar Withdrawn
AF2-324 Edgecombe 230 kV 230 45 Solar Withdrawn
AC1-034 Edgecome Solar Energy Center 115 42.8 Solar Engineering and Procurement
AI2-299 Benson-Dunbar 115 kV 115 30.8 Solar Withdrawn
Z2-088 Conetoe II Solar Park 230 30.4 Solar In Service
AE2-044 Anaconda-Dunbar 115 kV 115 28 Solar Withdrawn
AA1-050 Conetoe II Solar Park 230 25.6 Solar In Service
AI2-141 Heartsease DP - Mayo Dunbar 115kV 115 18.8 Solar Withdrawn
C01-1651 Beech Branch 115 kV 115 18.8 Solar Active
AE2-207 Heartsease DP-Mayo Dunbar 115 kV 115 18 Battery Withdrawn
AF1-082 Heartsease-Mayo Dunbar DP n/r 18 Battery Withdrawn
AF2-326 Battleboro 34.5kV 34.5 16 Hybrid Withdrawn
AG1-007 Lillie Solar 12.5 6 Solar Withdrawn
AB2-088 Tarboro 12.5kV 12.5 2.7 Solar Withdrawn
AH1-311 Heartsease DP - Mayo Dunbar 115kV 115 2.3 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.