Substation Scout

Beech Branch 115 kV

PJM queue ID C01-1651

Beech Branch 115 kV (C01-1651) is listed in the PJM interconnection queue as a 18.8 MW solar project in Edgecombe County, NC. The filing names Beech Branch as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 24, 2028.

Queue IDC01-1651
Project nameBeech Branch 115 kV
Status (as published)Active
SubstationBeech Branch
Point of interconnectionBeech Branch 115 kV
CountyEdgecombe
StateNC
Voltage115 kV
Capacity18.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-04-24
Source datasetcycle

Same substation and county

Edgecombe, NC: 23 requests in the PJM queue, 8 active totaling 341.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEdgecombe Solar LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity18.75
MFO75.0
Submitted date4/26/2026
Last updated5/12/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first