Swift Creek Solar
PJM queue ID AF2-303
Swift Creek Solar (AF2-303) is listed in the PJM interconnection queue as a 100 MW hybrid project in Edgecombe County, NC. The filing names Edgecombe as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 1, 2029.
| Queue ID | AF2-303 |
|---|---|
| Project name | Swift Creek Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Edgecombe |
| Point of interconnection | Edgecombe 230 kV |
| County | Edgecombe |
| State | NC |
| Voltage | 230 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-09-01 |
| Source dataset | serial |
Same substation and county
Edgecombe substation: 2 requests in the PJM queue, 1 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-324 | Edgecombe 230 kV | 45 | Solar | Withdrawn |
Edgecombe, NC: 23 requests in the PJM queue, 8 active totaling 341.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 100 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.