Edgecome Solar Energy Center
PJM queue ID AC1-034
Edgecome Solar Energy Center (AC1-034) is listed in the PJM interconnection queue as a 42.8 MW solar project in Edgecombe County, NC. The filing names Heartsease DP - Mayo Dunbar as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.
| Queue ID | AC1-034 |
|---|---|
| Project name | Edgecome Solar Energy Center |
| Status (as published) | Engineering and Procurement |
| Substation | Heartsease DP - Mayo Dunbar |
| Point of interconnection | Heartsease DP - Mayo Dunbar 115kV |
| County | Edgecombe |
| State | NC |
| Voltage | 115 kV |
| Capacity | 42.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Heartsease DP - Mayo Dunbar substation: 3 requests in the PJM queue, 2 active totaling 45.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-311 | Heartsease DP - Mayo Dunbar 115kV | 2.3 | Solar | Active |
| AI2-141 | Heartsease DP - Mayo Dunbar 115kV | 18.8 | Solar | Withdrawn |
Edgecombe, NC: 23 requests in the PJM queue, 8 active totaling 341.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75 |
| MW capacity | 42.75 |
| MFO | 75 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.