Moccasin Creek Solar
PJM queue ID AB2-059
Moccasin Creek Solar (AB2-059) is listed in the PJM interconnection queue as a 66 MW solar project in Edgecombe County, NC. The filing names Benson-Dunbar as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 15, 2020.
| Queue ID | AB2-059 |
|---|---|
| Project name | Moccasin Creek Solar |
| Status (as published) | In Service |
| Substation | Benson-Dunbar |
| Point of interconnection | Benson-Dunbar 115kV |
| County | Edgecombe |
| State | NC |
| Voltage | 115 kV |
| Capacity | 66 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2020-06-15 |
| Source dataset | serial |
Same substation and county
Benson-Dunbar substation: 2 requests in the PJM queue, 1 active totaling 66 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-299 | Benson-Dunbar 115 kV | 30.8 | Solar | Withdrawn |
Edgecombe, NC: 23 requests in the PJM queue, 8 active totaling 341.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 66 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.