PJM queue ID AD1-136

Nestlewood Solar (AD1-136) is listed in the PJM interconnection queue as a 5.4 MW solar project in Clermont County, OH. The filing names South Bethel-Brown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2024.

Queue IDAD1-136
Project nameNestlewood Solar
Status (as published)In Service
SubstationSouth Bethel-Brown
Point of interconnectionSouth Bethel-Brown 69 kV
CountyClermont
StateOH
Voltage69 kV
Capacity5.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-03-31
Source datasetserial

Same substation and county

Clermont, OH: 23 requests in the PJM queue, 8 active totaling 1,194.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity5.4
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first