Nestlewood Solar
PJM queue ID AD1-136
Nestlewood Solar (AD1-136) is listed in the PJM interconnection queue as a 5.4 MW solar project in Clermont County, OH. The filing names South Bethel-Brown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2024.
| Queue ID | AD1-136 |
|---|---|
| Project name | Nestlewood Solar |
| Status (as published) | In Service |
| Substation | South Bethel-Brown |
| Point of interconnection | South Bethel-Brown 69 kV |
| County | Clermont |
| State | OH |
| Voltage | 69 kV |
| Capacity | 5.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-03-31 |
| Source dataset | serial |
Same substation and county
Clermont, OH: 23 requests in the PJM queue, 8 active totaling 1,194.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 10 |
| MW capacity | 5.4 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.