Substation Scout

Colver Power

PJM queue ID A10

Colver Power (A10) is listed in the PJM interconnection queue as a 6 MW coal project in Cambria County, PA. The filing names Glory as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 8, 2000.

Queue IDA10
Project nameColver Power
Status (as published)In Service
SubstationGlory
Point of interconnectionGlory 115 kV
CountyCambria
StatePA
Voltage115 kV
Capacity6 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Target commercial operation2000-01-08
Source datasetserial

Same substation and county

Glory substation: 2 requests in the PJM queue, 1 active totaling 6 MW.

Queue IDProjectMWResourceStatus
AI1-115Glory 34.5 kV9.9HybridWithdrawn

Cambria, PA: 46 requests in the PJM queue, 13 active totaling 1,643.7 MW.

A substation with the same name is named in PJM transmission planning materials: Glory (PENELEC, 11 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6
MW capacity6
MFO6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.