Zorn Substation substation interconnection queue
5 active projects totaling 2,000.5 MW in the ERCOT queue.
5 ERCOT queue filings name Zorn Substation as the point of interconnection, all in Guadalupe County, TX.
Target commercial operation dates as filed run from Dec 2028 to Dec 2032 (5 filings). 5 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Palomino Alpha, LLC (5 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0532 | Alpha Power Phase 1 | 345 | 400.1 | Gas | SS Completed, FIS Started, No IA | Dec 2028 |
| 29INR0363 | Alpha Power Phase 2 | 345 | 400.1 | Gas | SS Completed, FIS Started, No IA | Dec 2029 |
| 30INR0143 | Alpha Power Phase 3 | 345 | 400.1 | Gas | SS Completed, FIS Started, No IA | Dec 2030 |
| 31INR0025 | Alpha Power Phase 4 | 345 | 400.1 | Gas | SS Completed, FIS Started, No IA | Dec 2031 |
| 32INR0007 | Alpha Power Phase 5 | 345 | 400.1 | Gas | SS Completed, FIS Started, No IA | Dec 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
5 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 28INR0532 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-11-09 | 29INR0363 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-11-09 | 30INR0143 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-11-09 | 31INR0025 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-11-09 | 32INR0007 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Same name on other Substation Scout pages
Other sources that print a substation named “Zorn Substation” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
Other ERCOT queue substations in Guadalupe County, TX
- tap Elm Creek - STP ckt 1: 3 active, 607.9 MW of 3 filed
- RIONOG: 2 active, 6.2 MW of 2 filed