Zorn Substation substation interconnection queue

5 active projects totalling 2,000.5 MW in the ERCOT queue.

5active projects
2,000.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
28INR0532 Alpha Power Phase 1 345 400.1 Gas SS Started, FIS Started, No IA
29INR0363 Alpha Power Phase 2 345 400.1 Gas SS Started, FIS Started, No IA
30INR0143 Alpha Power Phase 3 345 400.1 Gas SS Started, FIS Started, No IA
31INR0025 Alpha Power Phase 4 345 400.1 Gas SS Started, FIS Started, No IA
32INR0007 Alpha Power Phase 5 345 400.1 Gas SS Started, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.