Guadalupe, TX interconnection queue

17 active projects totalling 4,064.5 MW in the ERCOT queue, plus 3 with terminal status (shown greyed).

17active projects
4,064.5active MW
20total filed
Queue IDProjectkVMWResourceStatus
24INR0145 Calpine Guadalupe Peakers 345 450 Gas SS Completed, FIS Started, No IA
28INR0532 Alpha Power Phase 1 345 400.1 Gas SS Started, FIS Started, No IA
29INR0363 Alpha Power Phase 2 345 400.1 Gas SS Started, FIS Started, No IA
30INR0143 Alpha Power Phase 3 345 400.1 Gas SS Started, FIS Started, No IA
31INR0025 Alpha Power Phase 4 345 400.1 Gas SS Started, FIS Started, No IA
32INR0007 Alpha Power Phase 5 345 400.1 Gas SS Started, FIS Started, No IA
29INR0211 Enfinity Juniper Storage n/r 261.1 Battery SS Completed, FIS Started, No IA
24INR0287 Rockridge Solar 138 211.2 Solar SS Completed, FIS Started, IA
27INR0093 Guadalupe Battery Storage Project 345 210.5 Battery SS Completed, FIS Started, No IA
23INR0192 Utica Solar n/r 204.5 Solar Inactive
24INR0241 Utica BESS n/r 203.9 Battery Inactive
24INR0007 Nockenut Springs Solar 2 345 203.3 Solar SS Completed, FIS Started, IA
23INR0088 Nockenut Springs Solar 1 345 203.2 Solar SS Completed, FIS Completed, IA
28INR0391 Ruedrich BESS n/r 200.6 Battery SS Completed, FIS Started, No IA
24INR0115 Aster Solar 345 160.5 Solar SS Completed, FIS Started, No IA
27INR0117 Roble BESS 138 154.3 Battery SS Completed, FIS Started, No IA
20INR0299 Sparkl BESS n/r 20 Battery Inactive
23INR0483 Rio Nogales CT1 Rotor Replacement 345 3.1 Gas In Queue
24INR0602 CPS Rio Nogales CT301 Rotor Replacement 345 3.1 Gas In Queue
25INR0665 CPS Rio Nogales CT201 Rotor Replacement 345 3.1 Gas In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.