Zorn

Named in 4 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of October 1, 2025.

—county as printed
138, 345kV
LCRATSC, STECutility
4projects listed

No HIFLD substation record has this name in this county.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
LCRATSC Garfield - Lytton Springs Transmission Line Upgrade
LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.
ERCOT project 104635 · utility no. PLC-8063, PLC-8139, PLC-8140 · RTP 2024-SC19
LCRATSC
Tier 1
Planned
Future tab
345 May 2028 7048 to 9074
Bastrop / Caldwell County
Austrop, Zorn
LCRA TSC Lytton Springs - Zorn Transmission Line Upgrade
LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.
ERCOT project 104639 · utility no. PLC-8063, PLC-8139, PLC-8140 · RTP 2024-SC19
LCRATSC
Tier 1
Planned
Future tab
345 May 2029 9074 to 7042
Caldwell / Guadalupe County
Austrop, Zorn
STEC Rodgers Large Load Project Phase 2
-Rebuild LCRA Henne to Zorn 138kV line to 245 MVA -Install cap bank 19.2 MVAR at STEC Natalia 69kV - Rebuild Palo Duro to Dilley 138kV line with a conductor rated at least 312 MVA - Install a new 134MVAR cap bank at AEP Lytle 138kV - Rebuild CPS / AEP Lytle - Lytle with conductors rated 354 MVA -Rebuild AEP Big Foot to Pleasanton 138kV with conductors 147 MVA - install new cap bank 55.01 MVAR at P…
ERCOT project 110525 · RPG 25RPG046
STEC
Tier 1
Conceptual
Future tab
138 Dec 2030 No terminals printed Henne, Zorn, Palo Duro, Dilley, Big Foot, Pleasanton, Bader, Pearson, Omicron, Rafter, Bander, Hamilton Wolf, Hondo Creek, Devine
LCRATSC Austrop - Garfield Transmission Line Upgrade
LCRA TSC will upgrade the Austrop - Zorn 345-kV double-circuit transmission line to achieve a higher operational rating. Coordinating PMCRs include 91312, 104635, and 104639.
ERCOT project 91312 · utility no. PLC-8063, PLC-8139, PLC-8140 · RTP 2024-SC19
LCRATSC
Tier 1
Planned
Future tab
345 May 2027 7040 to 7048
Travis / Bastrop County
Austrop, Zorn

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110525First listedon the Future tab
July 13, 202691312Projected in-service dateMay 2028 → May 2027
June 1, 2026104635First listedon the Future tab
June 1, 2026104639First listedon the Future tab
June 1, 202691312First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.