Alpha Power Phase 1

ERCOT queue ID 28INR0532

Alpha Power Phase 1 (28INR0532) is listed in the ERCOT interconnection queue as a 400.1 MW gas project in Guadalupe County, TX. The filing names Zorn Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on October 6, 2026.

Queue ID28INR0532
Project nameAlpha Power Phase 1
Status (as published)SS Completed, FIS Started, No IA
SubstationZorn Substation
Point of interconnection345kV 7042 Zorn Substation
CountyGuadalupe
StateTX
Voltage345 kV
Capacity400.1 MW
Resource (as published)GAS/GT
Resource categoryGas (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zorn Substation substation: 5 requests in the ERCOT queue, 5 active totaling 2,000.5 MW.

Queue IDProjectMWResourceStatus
29INR0363Alpha Power Phase 2400.1GasSS Completed, FIS Started, No IA
30INR0143Alpha Power Phase 3400.1GasSS Completed, FIS Started, No IA
31INR0025Alpha Power Phase 4400.1GasSS Completed, FIS Started, No IA
32INR0007Alpha Power Phase 5400.1GasSS Completed, FIS Started, No IA

Guadalupe, TX: 20 requests in the ERCOT queue, 16 active totaling 3,904 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityPalomino Alpha, LLC
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeGT
Screening study complete2026-10-06

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.