tap Elm Creek - STP ckt 1 substation interconnection queue
3 active projects totaling 607.9 MW in the ERCOT queue.
3 ERCOT queue filings name tap Elm Creek - STP ckt 1 as the point of interconnection, all in TX.
Target commercial operation date as filed: Jun 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Pecan Springs Energy, LLC (3 filings).
3active projects
607.9active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0007 | Nockenut Springs Solar 2 | 345 | 203.3 | Solar | SS Completed, FIS Started, IA | Jun 2029 |
| 23INR0088 | Nockenut Springs Solar 1 | 345 | 203.2 | Solar | SS Completed, FIS Completed, IA | Jun 2029 |
| 25INR0010 | Nockenut Springs Solar 3 | 345 | 201.4 | Solar | SS Completed, FIS Started, No IA | Jun 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Guadalupe County, TX
- Zorn Substation: 5 active, 2,000.5 MW of 5 filed
- RIONOG: 2 active, 6.2 MW of 2 filed
Other ERCOT queue substations in Gonzales County, TX
- tap Deer Creek - Nixon: 2 active, 128.5 MW of 2 filed
Site Scanner