RIONOG substation interconnection queue
2 active projects totaling 6.2 MW in the ERCOT queue.
2 ERCOT queue filings name RIONOG as the point of interconnection, all in Guadalupe County, TX.
Target commercial operation date as filed: Aug 2026 (2 filings).
Interconnecting entity as filed: CPS Energy (2 filings).
2active projects
6.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0602 | CPS Rio Nogales CT301 Rotor Replacement | 345 | 3.1 | Gas | In Queue | Aug 2026 |
| 25INR0665 | CPS Rio Nogales CT201 Rotor Replacement | 345 | 3.1 | Gas | In Queue | Aug 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Guadalupe County, TX
- Zorn Substation: 5 active, 2,000.5 MW of 5 filed
- tap Elm Creek - STP ckt 1: 3 active, 607.9 MW of 3 filed