RIONOG substation interconnection queue
2 active projects totalling 6.2 MW in the ERCOT queue.
2active projects
6.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0602 | CPS Rio Nogales CT301 Rotor Replacement | 345 | 3.1 | Gas | In Queue |
| 25INR0665 | CPS Rio Nogales CT201 Rotor Replacement | 345 | 3.1 | Gas | In Queue |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.