RIONOG substation interconnection queue

2 active projects totaling 6.2 MW in the ERCOT queue.

2 ERCOT queue filings name RIONOG as the point of interconnection, all in Guadalupe County, TX.

Target commercial operation date as filed: Aug 2026 (2 filings).

Interconnecting entity as filed: CPS Energy (2 filings).

2active projects
6.2active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0602 CPS Rio Nogales CT301 Rotor Replacement 345 3.1 Gas In Queue Aug 2026
25INR0665 CPS Rio Nogales CT201 Rotor Replacement 345 3.1 Gas In Queue Aug 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.