RIONOG substation interconnection queue

2 active projects totalling 6.2 MW in the ERCOT queue.

2active projects
6.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0602 CPS Rio Nogales CT301 Rotor Replacement 345 3.1 Gas In Queue
25INR0665 CPS Rio Nogales CT201 Rotor Replacement 345 3.1 Gas In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.