2 active projects totaling 247.5 MW in the ERCOT queue.
2 ERCOT queue filings name Zenaida Bus# as the point of interconnection, all in Duval County, TX.
Target commercial operation date as filed: Sep 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Dove Wing Energy Center, LLC (2 filings).
2active projects
247.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0391 | Jumping Cactus Storage | 138 | 125.3 | Battery | SS Completed, FIS Started, No IA | Sep 2029 |
| 26INR0393 | Dove Wing Storage | 138 | 122.2 | Battery | SS Completed, FIS Started, No IA | Sep 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Duval County, TX
- Tap Bus # Miguel5 - Bus # Cruce7A Ckt 1: 3 active, 1,157.9 MW of 3 filed
- Tap (Cruce) - (San Miguel) Ckt 1: 2 active, 401.6 MW of 2 filed
- Bruni (#) – Crestonio (#) line; AEP: 1 active, 0 MW of 2 filed