Bruni (#) – Crestonio (#) line; AEP substation interconnection queue

2 active projects totalling 150.5 MW in the ERCOT queue.

2active projects
150.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0196 Realitos Solar SLF 138 150.5 Solar SS Completed, FIS Started, No IA
26INR0195 Realitos Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.