Tap Big Brown to Navarro ckt#2 substation interconnection queue
2 active projects totaling 455 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Big Brown to Navarro ckt#2 as the point of interconnection, all in Freestone County, TX.
Target commercial operation date as filed: Oct 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Silver Dollar Solar Project, LLC (2 filings).
2active projects
455active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0186 | Silver Dollar Solar | 345 | 301.9 | Solar | SS Completed, FIS Started, No IA | Oct 2029 |
| 27INR0187 | Silver Dollar Storage | 345 | 153.1 | Battery | SS Completed, FIS Started, No IA | Oct 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Freestone County, TX
- Tap RICHLND2_5 - BIGBRNW_5: 2 active, 452.4 MW of 2 filed
- Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ): 2 active, 200.3 MW of 2 filed
- Tap 212 Winkler - Pin Oak: 2 active, 100.5 MW of 2 filed
Site Scanner