Substation Scout

Tap Big Brown to Navarro ckt#2 substation interconnection queue

2 active projects totalling 455 MW in the ERCOT queue.

2active projects
455active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0186 Silver Dollar Solar 345 301.9 Solar SS Completed, FIS Started, No IA
27INR0187 Silver Dollar Storage 345 153.1 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.