Silver Dollar Solar
ERCOT queue ID 27INR0186
Silver Dollar Solar (27INR0186) is listed in the ERCOT interconnection queue as a 301.9 MW solar project in Freestone County, TX. The filing names Tap Big Brown to Navarro ckt#2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 31, 2029. It records the screening study as complete on August 29, 2024.
| Queue ID | 27INR0186 |
|---|---|
| Project name | Silver Dollar Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Big Brown to Navarro ckt#2 |
| Point of interconnection | Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2 |
| County | Freestone |
| State | TX |
| Voltage | 345 kV |
| Capacity | 301.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-10-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Big Brown to Navarro ckt#2 substation: 2 requests in the ERCOT queue, 2 active totaling 455 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0187 | Silver Dollar Storage | 153.1 | Battery | SS Completed, FIS Started, No IA |
Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Silver Dollar Solar Project, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2024-08-29 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.