Silver Dollar Solar

ERCOT queue ID 27INR0186

Queue ID27INR0186
Project nameSilver Dollar Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Big Brown to Navarro ckt#2
Point of interconnectionTap 345 kV Big Brown 3380 to Navarro 68091 ckt#2
CountyFreestone
StateTX
Voltage345 kV
Capacity301.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2028-04-28
Source datasetlarge

Additional filed fields

Interconnecting EntitySilver Dollar Solar Project, LLC
Cdr ZoneNORTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete45533
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.