Tap 212 Winkler - Pin Oak substation interconnection queue

2 active projects totalling 100.5 MW in the ERCOT queue.

2active projects
100.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0532 Timber Cove Solar SLF 138 100.5 Solar SS Completed, FIS Started, No IA
26INR0394 Timber Cove Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.