Tap RICHLND2_5 - BIGBRNW_5 substation interconnection queue

2 active projects totalling 452.4 MW in the ERCOT queue.

2active projects
452.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0082 Amerada Solar 345 301.6 Solar SS Completed, FIS Started, No IA
26INR0084 Amerada Storage 345 150.8 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.