Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) substation interconnection queue

2 active projects totalling 200.3 MW in the ERCOT queue.

2active projects
200.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0269 Bar Candela Solar SLF n/r 200.3 Solar SS Completed, FIS Completed, IA
24INR0271 Bar Candela Storage SLF n/r 0 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.