Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) substation interconnection queue

2 active projects totaling 200.3 MW in the ERCOT queue.

2 ERCOT queue filings name Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) as the point of interconnection, all in Freestone County, TX.

Target commercial operation date as filed: May 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Bar Candela Solar Project LLC (1 filing), Bar Candela Storage Project LLC (1 filing).

2active projects
200.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0269 Bar Candela Solar SLF n/r 200.3 Solar SS Completed, FIS Started, IA May 2029
24INR0271 Bar Candela Storage SLF n/r 0 Battery SS Completed, FIS Started, IA May 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0524INR0269Status changen/a SS Completed, FIS Completed, IA → SS Completed, FIS Started, IA
2026-10-0524INR0271Status changen/a SS Completed, FIS Completed, IA → SS Completed, FIS Started, IA

Other ERCOT queue substations in Freestone County, TX

All 24 ERCOT queue filings in Freestone County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first