Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) substation interconnection queue
2 active projects totalling 200.3 MW in the ERCOT queue.
2active projects
200.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0269 | Bar Candela Solar SLF | n/r | 200.3 | Solar | SS Completed, FIS Completed, IA |
| 24INR0271 | Bar Candela Storage SLF | n/r | 0 | Battery | SS Completed, FIS Completed, IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.