Long Lake Sub (Bus ) – Long Lake Tap Switch (Bus ) substation interconnection queue

2 active projects totalling 200.3 MW in the ERCOT queue.

2active projects
200.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0269 Bar Candela Solar SLF n/r 200.3 Solar SS Completed, FIS Started, IA
24INR0271 Bar Candela Storage SLF n/r 0 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.