Silver Dollar Storage (27INR0187) is listed in the ERCOT interconnection queue as a 153.1 MW battery project in Freestone County, TX. The filing names Tap Big Brown to Navarro ckt#2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 31, 2029. It records the screening study as complete on August 29, 2024.

Queue ID27INR0187
Project nameSilver Dollar Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Big Brown to Navarro ckt#2
Point of interconnectionTap 345 kV Big Brown 3380 to Navarro 68091 ckt#2
CountyFreestone
StateTX
Voltage345 kV
Capacity153.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Big Brown to Navarro ckt#2 substation: 2 requests in the ERCOT queue, 2 active totaling 455 MW.

Queue IDProjectMWResourceStatus
27INR0186Silver Dollar Solar301.9SolarSS Completed, FIS Started, No IA

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySilver Dollar Solar Project, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2024-08-29

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first