Timber Cove Solar SLF (24INR0532) is listed in the ERCOT interconnection queue as a 100.5 MW solar project in Freestone County, TX. The filing names Tap 212 Winkler - Pin Oak as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2027. It records the screening study as complete on August 17, 2023.

Queue ID24INR0532
Project nameTimber Cove Solar SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationTap 212 Winkler - Pin Oak
Point of interconnectionTap 138 kV 212 Winkler - 3510 Pin Oak
CountyFreestone
StateTX
Voltage138 kV
Capacity100.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap 212 Winkler - Pin Oak substation: 2 requests in the ERCOT queue, 2 active totaling 100.5 MW.

Queue IDProjectMWResourceStatus
26INR0394Timber Cove Storage SLF0BatterySS Completed, FIS Started, No IA

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFreestone Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2023-08-17
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.