Revilla substation interconnection queue

2 active projects totaling 203.6 MW in the ERCOT queue.

2 ERCOT queue filings name Revilla as the point of interconnection, all in Zapata County, TX.

Target commercial operation date as filed: Feb 2032 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Falcon Energy Project (2 filings).

2active projects
203.6active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
28INR0483 Falcon II BESS 138 103.3 Battery SS Completed, FIS Started, No IA Feb 2032
28INR0482 Falcon II Solar 138 100.3 Solar SS Completed, FIS Started, No IA Feb 2032

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Zapata County, TX

All 28 ERCOT queue filings in Zapata County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first