Substation Scout

Revilla substation interconnection queue

2 active projects totalling 203.6 MW in the ERCOT queue.

2active projects
203.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0483 Falcon II BESS 138 103.3 Battery SS Completed, FIS Started, No IA
28INR0482 Falcon II Solar 138 100.3 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.