Revilla substation interconnection queue
2 active projects totaling 203.6 MW in the ERCOT queue.
2 ERCOT queue filings name Revilla as the point of interconnection, all in Zapata County, TX.
Target commercial operation date as filed: Feb 2032 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Falcon Energy Project (2 filings).
2active projects
203.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0483 | Falcon II BESS | 138 | 103.3 | Battery | SS Completed, FIS Started, No IA | Feb 2032 |
| 28INR0482 | Falcon II Solar | 138 | 100.3 | Solar | SS Completed, FIS Started, No IA | Feb 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Zapata County, TX
- # Rapido: 2 active, 395.6 MW of 2 filed
- ETT Tiempo # Substation (Tap on CENIZO7C - DELSOL7C): 2 active, 391.5 MW of 2 filed
- Tap CENIZO7C - DELSOL7C (New ETT Tiempo Substation): 2 active, 391.5 MW of 2 filed
- tap Zapata - Lopeno4A: 2 active, 155.7 MW of 2 filed