# Rapido substation interconnection queue
2 active projects totaling 395.6 MW in the ERCOT queue.
2 ERCOT queue filings name # Rapido as the point of interconnection, all in Zapata County, TX.
Target commercial operation date as filed: May 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Cascabel Wind Energy, LLC (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0337 | Barrosos Creek Wind 3 | 345 | 197.8 | Wind | SS Completed, FIS Started, No IA | May 2028 |
| 28INR0338 | Barrosos Creek Wind 4 | 345 | 197.8 | Wind | SS Completed, FIS Started, No IA | May 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “# Rapido” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Rapido: Expansion Tracker, ERCOT planning (Starr County, TX)
Other ERCOT queue substations in Zapata County, TX
- ETT Tiempo # Substation (Tap on CENIZO7C - DELSOL7C): 2 active, 391.5 MW of 2 filed
- Tap CENIZO7C - DELSOL7C (New ETT Tiempo Substation): 2 active, 391.5 MW of 2 filed
- Revilla: 2 active, 203.6 MW of 2 filed
- tap Zapata - Lopeno4A: 2 active, 155.7 MW of 2 filed