tap Zapata - Lopeno4A substation interconnection queue

2 active projects totaling 155.7 MW in the ERCOT queue.

2 ERCOT queue filings name tap Zapata - Lopeno4A as the point of interconnection, all in Zapata County, TX.

Target commercial operation date as filed: Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Rio Grande River Solar LLC (2 filings).

2active projects
155.7active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
23INR0215 Big River Solar 138 104.4 Solar SS Completed, FIS Started, No IA Dec 2028
23INR0237 Big River BESS 138 51.3 Battery SS Completed, FIS Started, No IA Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Zapata County, TX

All 28 ERCOT queue filings in Zapata County, TX.