tap Zapata - Lopeno4A substation interconnection queue
2 active projects totalling 155.7 MW in the ERCOT queue.
2active projects
155.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 23INR0215 | Big River Solar | 138 | 104.4 | Solar | SS Completed, FIS Started, No IA |
| 23INR0237 | Big River BESS | 138 | 51.3 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.