Substation Scout

Falcon II Solar

ERCOT queue ID 28INR0482

Falcon II Solar (28INR0482) is listed in the ERCOT interconnection queue as a 100.3 MW solar project in Zapata County, TX. The filing names Revilla as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 16, 2032. It records the screening study as complete on June 17, 2026.

Queue ID28INR0482
Project nameFalcon II Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationRevilla
Point of interconnection8004 Revilla 138 kV
CountyZapata
StateTX
Voltage138 kV
Capacity100.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2032-02-16
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Revilla substation: 2 requests in the ERCOT queue, 2 active totaling 203.6 MW.

Queue IDProjectMWResourceStatus
28INR0483Falcon II BESS103.3BatterySS Completed, FIS Started, No IA

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFalcon Energy Project
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2026-06-17
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.