Liberty Station substation interconnection queue
2 active projects totaling 203.5 MW in the ERCOT queue.
2 ERCOT queue filings name Liberty Station as the point of interconnection, all in Hill County, TX.
Target commercial operation dates as filed run from Apr 2029 to Jul 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Mercury Solar (1 filing), Mercury Storage, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0407 | Mercury Solar III | 345 | 203.5 | Solar | SS Completed, FIS Started, IA | Apr 2029 |
| 21INR0258 | Mercury Storage SLF | 345 | 0 | Battery | SS Completed, FIS Started, No IA | Jul 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Liberty Station” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
Other ERCOT queue substations in Hill County, TX
- Sam Switch Bus: 2 active, 1,048.8 MW of 2 filed
- tap Venus - Sam Sw: 2 active, 404.7 MW of 2 filed
- Tap 445 Yates - 444 Covington: 2 active, 276 MW of 2 filed