Tap Ash Creek Switch (Bus #) – Revolution Switch (Bus #) substation interconnection queue

2 active projects totalling 164.1 MW in the ERCOT queue.

2active projects
164.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0402 HILLBORO BESS 138 130.9 Battery SS Completed, FIS Started, No IA
27INR0312 HILLBORO WIND 138 33.2 Wind SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.