tap Venus - Sam Sw substation interconnection queue

2 active projects totaling 404.7 MW in the ERCOT queue.

2 ERCOT queue filings name tap Venus - Sam Sw as the point of interconnection, all in Hill County, TX.

Target commercial operation dates as filed run from Dec 2027 to Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Hillsboro Solar Project LLC (2 filings).

2active projects
404.7active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
25INR0229 OCI Cobb Creek Solar 345 203.1 Solar SS Completed, FIS Completed, IA Dec 2027
25INR0233 OCI Cobb Creek ESS 345 201.6 Battery SS Completed, FIS Completed, IA Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Hill County, TX

All 27 ERCOT queue filings in Hill County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first