Mercury Solar III
ERCOT queue ID 24INR0407
Mercury Solar III (24INR0407) is listed in the ERCOT interconnection queue as a 203.5 MW solar project in Hill County, TX. The filing names Liberty Station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of April 1, 2029. It records the screening study as complete on November 11, 2022 and the interconnection agreement as signed on December 12, 2025.
| Queue ID | 24INR0407 |
|---|---|
| Project name | Mercury Solar III |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Liberty Station |
| Point of interconnection | 68092 Liberty Station 345kV |
| County | Hill |
| State | TX |
| Voltage | 345 kV |
| Capacity | 203.5 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-04-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Liberty Station substation: 2 requests in the ERCOT queue, 2 active totaling 203.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 21INR0258 | Mercury Storage SLF | 0 | Battery | SS Completed, FIS Started, No IA |
Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Mercury Solar |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-12-12 |
| Screening study complete | 2022-11-11 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.