CPS Rio Nogales CT301 Rotor Replacement
ERCOT queue ID 24INR0602
CPS Rio Nogales CT301 Rotor Replacement (24INR0602) is listed in the ERCOT interconnection queue as a 3.1 MW gas project in Guadalupe County, TX. The filing names RIONOG as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of August 7, 2026. It records the interconnection agreement as signed on November 10, 2023.
| Queue ID | 24INR0602 |
|---|---|
| Project name | CPS Rio Nogales CT301 Rotor Replacement |
| Status (as published) | In Queue |
| Substation | RIONOG |
| Point of interconnection | 5362 RIONOG 345kV |
| County | Guadalupe |
| State | TX |
| Voltage | 345 kV |
| Capacity | 3.1 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2026-08-07 |
| Source dataset | small |
Same substation and county
RIONOG substation: 2 requests in the ERCOT queue, 2 active totaling 6.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 25INR0665 | CPS Rio Nogales CT201 Rotor Replacement | 3.1 | Gas | In Queue |
Guadalupe, TX: 20 requests in the ERCOT queue, 16 active totaling 3,904 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | CPS Energy |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | GAS |
| Technology code | CC |
| Interconnection agreement signed | 2023-11-10 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.