Rio Nogales CT1 Rotor Replacement

ERCOT queue ID 23INR0483

Rio Nogales CT1 Rotor Replacement (23INR0483) is listed in the ERCOT interconnection queue as a 3.1 MW gas project in Guadalupe County, TX. The filing names Rio Nogales Substation RIONOG as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of August 7, 2026. It records the interconnection agreement as signed on January 20, 2023.

Queue ID23INR0483
Project nameRio Nogales CT1 Rotor Replacement
Status (as published)In Queue
SubstationRio Nogales Substation RIONOG
Point of interconnectionRio Nogales Substation 5362 RIONOG 345kV
CountyGuadalupe
StateTX
Voltage345 kV
Capacity3.1 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2026-08-07
Source datasetsmall

Same substation and county

Guadalupe, TX: 20 requests in the ERCOT queue, 16 active totaling 3,904 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCPS Energy
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeCC
Interconnection agreement signed2023-01-20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.