Rockridge Solar
ERCOT queue ID 24INR0287
Rockridge Solar (24INR0287) is listed in the ERCOT interconnection queue as a 211.2 MW solar project in Guadalupe County, TX. The filing names Hickory Forest as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 27, 2028. It records the screening study as complete on July 12, 2022 and the interconnection agreement as signed on March 14, 2025.
| Queue ID | 24INR0287 |
|---|---|
| Project name | Rockridge Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Hickory Forest |
| Point of interconnection | 7225 Hickory Forest 138kV |
| County | Guadalupe |
| State | TX |
| Voltage | 138 kV |
| Capacity | 211.2 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-06-27 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Guadalupe, TX: 20 requests in the ERCOT queue, 16 active totaling 3,904 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Magnolia Solar Development, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-03-14 |
| Screening study complete | 2022-07-12 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.