Substation Scout

Rockridge Solar

ERCOT queue ID 24INR0287

Rockridge Solar (24INR0287) is listed in the ERCOT interconnection queue as a 211.2 MW solar project in Guadalupe County, TX. The filing names Hickory Forest as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 27, 2028. It records the screening study as complete on July 12, 2022 and the interconnection agreement as signed on March 14, 2025.

Queue ID24INR0287
Project nameRockridge Solar
Status (as published)SS Completed, FIS Started, IA
SubstationHickory Forest
Point of interconnection7225 Hickory Forest 138kV
CountyGuadalupe
StateTX
Voltage138 kV
Capacity211.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-27
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Guadalupe, TX: 20 requests in the ERCOT queue, 16 active totaling 3,904 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMagnolia Solar Development, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-03-14
Screening study complete2022-07-12
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.