Substation Scout

Concho, TX interconnection queue

9 active projects totalling 2,656 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

9active projects
2,656active MW
10total filed
Queue IDProjectkVMWResourceStatus
26INR0255 Operation Sunshine 345 603.2 Solar SS Completed, FIS Started, IA
26INR0357 Operation Sunshine Storage 345 409.8 Battery SS Completed, FIS Started, IA
27INR0108 Paint Rock Wind n/r 379.2 Wind SS Completed, FIS Started, IA
25INR0225 Lucy Solar 345 352.2 Solar SS Completed, FIS Completed, IA
29INR0139 Trail Ranch Solar 1 345 301.9 Solar SS Completed, FIS Started, No IA
25INR0174 Concho Pearl Solar 345 171.9 Solar SS Completed, FIS Started, IA
25INR0175 Concho Pearl Storage 345 162.4 Battery SS Completed, FIS Started, IA
28INR0358 Cherry Sage Solar 1 SLF 138 142.5 Solar SS Completed, FIS Started, No IA
29INR0272 Trail Ranch Solar 2 345 132.9 Solar SS Completed, FIS Started, No IA
25INR0459 Old Sorrell Energy Storage n/r 43.1 Battery Inactive

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.