Substation Scout

Trail Ranch Solar 2

ERCOT queue ID 29INR0272

Queue ID29INR0272
Project nameTrail Ranch Solar 2
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Red Creek - Amos Creek
Point of interconnectionTap 345 kV 6444 Red Creek -7077 Amos Creek
CountyConcho
StateTX
Voltage345 kV
Capacity132.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-12-01
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 New request 132.9 Not reported → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting EntityAurora Solar LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete46106
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.