Cherry Sage Solar 1 SLF

ERCOT queue ID 28INR0358

Queue ID28INR0358
Project nameCherry Sage Solar 1 SLF
Status (as published)SS Completed, FIS Started, No IA
Substation(#) TREADWELL .
Point of interconnection(#60423) TREADWELL 138kV.
CountyConcho
StateTX
Voltage138 kV
Capacity142.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-02-23
Source datasetlarge

Additional filed fields

Interconnecting EntityCherry Sage Solar 1 LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete45861
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.